Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular Features

Community Features

Association

Property Features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

STUNNING HOME WITH A VIEW THAT WONT QUIT.
#TB8481872

ST PETE BEACH

2813 SUNSET WAY

5 Beds

5 Baths

5,924 Sq.Ft.

$11,000,000

MLS#: TB8481872

Pre-Construction. To be built. The Serena Model at Amané Estates, located within the Grand Reserve resort community, is a testament to modern beachfront design integrated with the beauty of Puerto Rico. Designed by OBMI, known for timeless and sustainable architecture, this residence exemplifies craftsmanship and environmental integration.
This five-bedroom, five-bathroom residence with an additional powder room spans 11,634 square feet of gross living area, including 7,075 square feet of air-conditioned interiors and 4,559 square feet dedicated to outdoor living, covered terraces, poolside entertaining areas, and open-air lounge spaces integrated into the home’s design. The home features soaring 11-foot ceilings throughout, while the entrance and great room boast dramatic 20-foot double-height ceilings that enhance openness and scale. With triple exposure to the north, south, and west, floor-to-ceiling hurricane-resistant windows fill the interiors with natural light and uninterrupted ocean views.
The expansive great room seamlessly connects the living, dining, and kitchen spaces to an oversized terrace and resort-style pool, creating a fluid indoor-outdoor lifestyle for daily living and entertaining. Natural materials and layered textures define the interiors, including Storia wood flooring, custom Artec wood carpentry, travertine and natural stone applications, and curated wallcoverings by brands such as Tower Wallcovering, Romo, and Momentum Textiles.
The kitchen was conceived as both a social centerpiece and a professional culinary environment, featuring quartz countertops by Pompeii, designer backsplash finishes, and custom cabinetry. The fully integrated appliance package includes Sub-Zero refrigerator and freezer columns, Wolf induction cooktop, built-in Wolf oven and speed oven, integrated coffee system, wine storage, Cove dishwasher, and outdoor grilling components, combining elevated aesthetics with exceptional performance.
Each bedroom was thoughtfully designed as a private retreat, with generous proportions and refined finishes. The primary suite features a spacious sleeping area, oversized walk-in closet, premium stone applications in ARCA Archipelago Honed, and a spa-inspired bathroom complete with a freestanding soaking tub, oversized shower, built-in sauna, Kohler matte black fixtures, and custom integrated vanities. Secondary bathrooms continue the same refined material palette with porcelain, marble, travertine, and natural stone finishes.
This residence is equipped with a Lutron smart home system, full backup generator, water cistern, and solar panel-ready infrastructure. The property also includes a two-car enclosed garage, dedicated golf cart garage, and wide driveway.
Residents of the Grand Reserve resort community, spanning 1,000 acres of lush beachfront grounds and offering two miles of pristine coastline, enjoy exclusive access to exclusive amenities, including the Caya Beach Club for beachfront dining and socializing, and the Batú Sports Center, featuring a 2,500-square-foot fitness facility, tennis courts, and paddle courts. The Grand Reserve Golf Club, an 18-hole championship course designed by Tom Kite, integrates ocean and rainforest vistas into a singular golfing experience.
Conveniently located just 25 minutes from Luis Muñoz Marín International Airport and near premier marinas, the Serena Model delivers a lifestyle defined by architectural integrity and a seamless connection to its surroundings.
Estimated Completion: Q4 2027
#PR9121209

RIO GRANDE

600 AMANE ESTATES, COCO BEACH BLVD 1

5 Beds

5 Baths

7,075 Sq.Ft.

$11,000,000

MLS#: PR9121209

89 MOL acres mixed use opportunity at the northeast corner of the intersection of State Rd 19 & County Rd 48 at the Mission Inn in Howey in the Hills, FL. Scenic vistas of Little Lake and Lake Harris are present from the rise to 125' peak elevation parcel with 1,300' on Little Lake Harris and 1,874' on SR 19. The Harris Chain of Lakes (Harris, Little Harris, Dora, Eustis, Griffin and Apopka are all connected) covers 10's of thousands of acres of lakes that allows you to travel to the Atlantic Ocean at Jacksonville. The tract is across SR 19 from a proposed grocery anchored shopping center that would have a traffic light at the subject.

Fast Growing part of Lake County
 Across the road from a proposed 100,000sf grocery anchored shopping center
 Mixed Use zoning possible in Howey in the Hills
 1,300' on Little Lake Harris/ 1,874' on SR 19
 Lake Harris Hickory Point Recreational Park and boat ramp one mile north on SR 19
 Water Utilities Available. Central Lake CDD is planning expansion of the sewer system
#P4928798

HOWEY IN THE HILLS

N HAMLIN AVENUE

None Beds

None Baths

34.23 acres

$11,000,000

MLS#: P4928798

GULF FRONT LAND FOR SALE | 160 FEET OF DIRECT GULF FRONTAGE | DESIGN YOUR DREAM LEGACY ESTATE  | A rare Gulf-front legacy offering on Florida’s west coast: two contiguous parcels being sold together, forming a unified estate spanning approximately 160 feet of pristine Gulf of Mexico frontage and 245 feet of depth, nearly one full acre of contiguous beachfront in Belleair Shore, one of the most quietly held addresses on the Gulf. 
Belleair Shore is exclusive by design. The town spans barely a quarter-mile of coastline, with a small permanent population and a charter that permits only 58 single-family residences in perpetuity. No condominiums. No hotels. No short-term rentals. No commerce. The result is a stretch of Gulf that feels, and functions, as private coastline. 
In a municipality of this scale, the combination of two side-by-side parcels into 160 contiguous feet of buildable Gulf frontage is a generational opportunity, the kind that surfaces only rarely, and sometimes not at all within a decade. 
The land itself is a canvas suited to the finest residential architecture. With proportions almost unheard of on the Pinellas Gulf, the unified footprint comfortably supports a complete estate program: a principal residence of true scale, expansive multi-bay garaging and motor court, pool pavilion, private gardens, and direct beach access. The 245-foot depth allows for the front-to-back architectural composition that defines the most celebrated estates of Palm Beach, Jupiter Island, and Manalapan, with a gracious arrival sequence and auto court on the boulevard, the principal residence framing the horizon, and a sunset terrace opening directly to the Gulf. 
Sugar-white quartz sand, the calm, shallow waters for which the Pinellas coast is known, and a due-west exposure that delivers some of the most celebrated sunsets in America, viewed nightly from your private shoreline. 
Moments from the historic Belleair Country Club, Florida’s first, laid out in part by Donald Ross, and minutes from both Tampa International and St. Pete–Clearwater International, with seamless private aviation access to the Northeast corridor, the Caribbean, and Europe. The cultural depth of St. Petersburg, Tampa, and Sarasota anchors the region, while world-class medical institutions, established independent schools, and Gulf Coast yachting are all immediately at hand. 
Florida homestead protections and the absence of state income tax. The privacy of an incorporated town of fewer than one hundred residents, with a community charter designed to preserve the qualities that drew owners here in the first place. 
For the discerning buyer seeking one of the last truly hidden addresses on Florida’s Gulf, this is a rare opportunity. 
Photos may include AI-enhanced images showing grass where old structures were removed.
#TB8502617

BELLEAIR SHORE

1420 and 1440 GULF BOULEVARD

None Beds

None Baths

0.9 acres

$11,000,000

MLS#: TB8502617

Positioned along the sparkling waters of Sarasota Bay, this extraordinary 1.7 acres of direct bayfront property presents a rare opportunity to create one or two landmark waterfront estates within one of Sarasota’s most desirable coastal settings. Comprised of two separate parcels, 2043 & 2046 Alameda Way, the property offers remarkable flexibility for an end user, developer, or multigenerational compound vision. Boasting an impressive 210 feet of direct bay frontage, the property captures panoramic open water views, breathtaking year-round sunsets, and exceptional boating water with a private dock already in place. The expansive footprint allows for the creation of one grand estate spanning both parcels or two significant luxury residences, each with its own commanding presence on Sarasota Bay. Custom estate plans have been designed for each parcel by renowned Choeff Levy Fischman Architecture + Design, thoughtfully envisioning world-class waterfront living that complements the scale, setting, and prestige of this exceptional offering. Tucked within a quiet waterfront enclave, the location offers privacy and tranquility while remaining moments from Downtown Sarasota’s acclaimed dining, shopping, arts, and cultural scene. Enjoy close proximity to the new The Bay Park, the iconic The John and Mable Ringling Museum of Art, and the convenience of Sarasota-Bradenton International Airport. An extraordinarily rare offering defined by scale, frontage, flexibility, and location, representing the opportunity to build one or two of Sarasota’s most significant bayfront residences.
#A4694028

SARASOTA

2046 ALAMEDA AVENUE

None Beds

None Baths

1.69 acres

$11,000,000

MLS#: A4694028

Welcome to "Tre Sorelle," a home of splendor and architectural authenticity, a true Tuscan farmhouse nestled in the premier waterfront community of Tierra Verde. From the early stages of its conception, which involved trips to Tuscany to research design and source materials, to the meticulous level of construction, every detail was given exceptional attention. This magnificent masterpiece provides seclusion and privacy, breathtaking beauty and luxurious quality that leaves a lasting impression. From the massive spread footings, concrete block structure (8" x 8" x 16" blocks) from foundation to roof line, and the first-floor living area situated at 13 feet above sea level, this home was constructed to withstand the tests of Mother Nature. In addition to the concrete block outer shell of the home, the entire exterior wall features a 10-to-12-inch layer of limestone quarried in the Province of Barletta-Andria-Trani and container shipped from Italy. The exterior walls are 18-to-20 inches thick in total, which is extraordinary, but perfect for Florida weather and lifestyle. The roof is a Ludowici Italian authentic cap and pan terra cotta roof tile with a 75-year warranty and the hurricane-impact windows and doors are a combination of Tischler und Sohn (U.S.A.) and Hope's Windows, the world's pre-eminent manufacturers of custom windows and doors. Encompassing over 11,000 square feet of luxury living, the home has seven bedrooms, eight full baths, three half baths, library, two offices, elevator, gym, and four-plus-car garage. Features of this home include soaring ceilings, impressive Douglas fir beam and plank work, solid mahogany doors throughout, and, extending from the lower-level entrance to the top floor, a beautiful cool honey-colored, pink veined Corton limestone spiral staircase, a stone steeped in French history emanating from the Burgundy region. The main level comprises an open floor plan with living room and gourmet kitchen, casual dining, formal dining room, two offices and a guest suite. The upper level features six en-suite bedrooms and a sun-filled library. The lower level has additional storage rooms, and gym. A tranquil oasis awaits outside, complete with expansive, covered lounging and dining areas, a fire pit surrounded by a moat and a salt-generating chlorine pool heated by a geothermal system, utilizing energy efficiency. Ideally located close to the thriving downtown of St. Petersburg and the Gulf beaches, less than 30 minutes to Tampa International Airport and yet perfect for those who are seeking peace and serenity.
#TB8336934

ST PETERSBURG

1571 OCEANVIEW DRIVE

7 Beds

8 Baths

11,366 Sq.Ft.

$11,000,000

MLS#: TB8336934

Welcome to the most Prestigious Estate in Dorado Beach East, this one-of-a-kind residence is set on the 7th largest lot in the community, offering rare scale, privacy, and distinction in one of Puerto Rico’s most exclusive coastal enclaves. Just a short walk to the beach, the property features 6 bedrooms, 8.5 baths, approximately 10,351 sq. ft. of living space, and expansive grounds designed for exceptional indoor-outdoor living. With the ability to host 400+ guests on property, this estate is ideal for grand entertaining, private celebrations, and resort-style gatherings at an unforgettable scale. A premier Dorado Beach East address, proximity to world-class resort amenities, golf, beaches, dining, and the estate’s remarkable lot size make this a truly special offering in the Caribbean luxury market. Property details, guest capacity, and lot ranking should be independently verified.
#PR9121531

DORADO

276 DORADO BEACH EAST

6 Beds

7 Baths

10,351 Sq.Ft.

$10,999,995

MLS#: PR9121531

Once a hidden gem, Oceanview Drive in Tierra Verde has become one of Tampa Bay’s most sought-after waterfront addresses — and 1363 Oceanview Drive stands as a true showpiece along its shoreline.

Designed for both privacy and entertaining, this extraordinary estate delivers the best of waterfront living. Perfectly positioned on the water with breathtaking southwest views of Shell Island Preserve and unforgettable sunsets, the property features a modern oversized dock complete with two boat lifts, a double jet ski lift, multiple boat slips, and easy-access ladders for paddleboards, kayaks, and canoes.

Lush, manicured landscaping provides a serene sense of seclusion while still allowing abundant natural light and outdoor enjoyment. The resort-style swimming pool was re-marcited in 2022, a new pool heater was added in 2021, and the surrounding travertine decking was coated with a non-slip finish in 2020. An expansive outdoor entertainment pavilion includes a built-in BBQ station, a three-sided full bar with appliances, dining and lounge areas, a fireplace, and a mounted flat-screen TV. The ceiling is pre-wired for speakers, fans, and misting systems. A separate one-bedroom, one-bath pool house offers ideal accommodations for guests.

The main residence is the crown jewel — a 4-bedroom, 4-full-bath estate with two additional half baths and three garages capable of housing up to five vehicles or recreational toys. An elevator provides effortless access to each level, from garage to kitchen to bedroom floors — ideal for daily convenience and ease of living.

Through the grand double iron entry doors, you’re welcomed into a stunning parlor with a double-sided fireplace shared with an executive office. The south wing leads to the luxurious primary suite, which opens to its own outdoor patio overlooking the pool, spa, and waterway. Dual walk-in closets with center jewelry island, separate vanities, dedicated sitting areas, a soaking tub, and a large walk-in shower complete the spa-like primary bath.

To the north of the parlor lies a formal dining room adjacent to a private, temperature-controlled wine cellar. The chef’s kitchen features hidden refrigerator/freezer panels, L-shaped custom cabinetry, a gas range, and premium stainless-steel appliances. Upstairs, three additional bedrooms, three full baths, a second living area, coffee/wine bar, and laundry room create a thoughtfully designed private retreat level.

What truly sets this home apart is its dedicated entertainment wing — a private bar, billiards room, arcade space, and a fully equipped movie theater. The bar is designed to impress, with multiple TVs, seating areas, and space for pool, darts, or game-day gatherings. The theater was recently upgraded with over $40,000 in new projection, audio, visual, and screen equipment.

Meticulously maintained and upgraded, the seller has spared no expense in recent years. From 2021–2023, interior travertine floors were buffed and polished, the parlor received new cherry hardwood flooring, gutters were repaired and cleaned, and over $40,000 was invested in new central AC systems. In 2025, a $150,000 dock renovation further enhanced the property’s waterfront lifestyle.

This is more than a home — it is a private waterfront resort built for luxury living, effortless entertaining, and unforgettable sunsets.
#TB8462413

TIERRA VERDE

1363 OCEANVIEW DRIVE

5 Beds

5 Baths

7,719 Sq.Ft.

$10,999,000

MLS#: TB8462413

Virtually Staged. Pre-Construction. To be built. This penthouse with three exposures sweeping across Sarasota Bay to the downtown skyline, Residence A is an invitation to experience the beauty of natural light from sunrise to sunset. Three private terraces, one with an outdoor kitchen, are accessed from the great room, which features 13-foot ceilings, an open-plan kitchen and large walk-in pantry. A cozy den is ideal for relaxing with a book or movie, and a powder room is convenient for visitors. Two guest suites open to a third, city-view terrace, while the third guest suite is set in a corner, where it enjoys marvelous water-to-skyline views. The thoughtfully designed primary suite offers two walk-in closets, a spa-style bath with a deep soaking bathtub, double vanity and double shower. In The Ritz-Carlton global tradition of peerless service, this private residence will enjoy a dedicated on-site team that takes pride in anticipating every need and fulfilling every wish. A 24-hour dedicated staff and concierge, food and beverage services available from private, on-site service kitchen, dedicated 24-hour valet,
housekeeping services and an impressive array of private amenities overlooking the sparkling yacht harbor. In addition to exceptional private amenities and services available exclusively to tower residents, membership in The Harbor Club provides access to nearly 20,000 square feet of amenities dedicated to socializing, health and wellness.
#A4670930

SARASOTA

555 QUAY COMMON 2001

4 Beds

4 Baths

4,926 Sq.Ft.

$10,999,000

MLS#: A4670930

Unveiling the pinnacle of coastal living at this pristine beachfront residence at Bonaire Longboat Key. A newer gem completed in 2020, this luxurious home, offered turnkey furnished, is a rare find that invites you to immediately immerse yourself in the lap of waterfront luxury. The bliss of waking up to the Gulf's gentle waves is just the beginning of what this remarkable retreat has to offer. Crafted with precision and built by Eason Home Builders, this home seamlessly blends modern innovation with the allure of West Indies-inspired architecture. The result is a masterpiece that stands as a testament to lavish living on the Gulf of Mexico. Every corner of this residence is designed to capture the breathtaking beach views that stretch to the horizon. From the towering great room windows to the inviting balconies on each floor, the Gulf's beauty is your constant companion. Step into an interior that's not just beautiful but also brilliantly functional. Designer furnishings, smart home conveniences, and striking light fixtures harmonize with oak wood flooring and sleek surfaces, creating an ambiance that's as modern as it is inviting. The heart of this home is a chef's dream come true. The gourmet kitchen is a symphony of elegance and functionality, boasting custom cabinetry, a sprawling island, and top-of-the-line appliances. The CornuFe polished white and stainless-steel trimmed gas stove, accompanied by a statement-piece range hood, add to the allure of this culinary haven. The master suite is a sanctuary of indulgence. Set in a secluded northwest spot, it offers a private sitting area framed by bay windows, his and her walk-in closets, and a spa-inspired en-suite bathroom. This residence embraces the outdoors as an integral part of its charm. Balconies on each floor offer panoramic views and create a seamless indoor-outdoor flow. Recent updates enhance the allure of this home. A/V upgrades, solar shades, water softener, reverse osmosis, water chiller, and water pressure booster are just the beginning. The indoor cabana opens to a resort-style pool deck, complete with covered dining, a summer kitchen, lounge areas, a fire pit, and a saltwater pool with a swim bar and raised spa. Beyond the pool, your own gated access leads you to the pristine shores of the Gulf. The meticulously landscaped yard features a hammock, and convenient outdoor shower. This home also includes an additional parcel (the current owners have transformed this area into a botanical garden with beautiful lush landscaping).  All that's missing in this turnkey masterpiece is you. With your personal belongings, you can step right into the lap of luxury and start savoring every moment.
#A4578997

LONGBOAT KEY

5005 GULF OF MEXICO DRIVE 3

5 Beds

5 Baths

4,638 Sq.Ft.

$10,995,000

MLS#: A4578997

Set along the deep-water shores of Bird Key, this direct bayfront estate is a striking architectural achievement designed by renowned architect Cliff Scholz and constructed to exceptional standards by luxury builder Murray Homes. Spanning nearly 6,600 square feet of elevated living space, the residence captures panoramic Sarasota Bay views that stretch out to the Gulf while blending timeless craftsmanship with extensive recent updates and resort-inspired outdoor living. Positioned behind manicured landscaping and a pavered circular drive, the home makes a grand first impression with its stately facade, three-car side-entry garage, and elevated waterfront setting. Inside, luxurious finishes define the two-story interior, including cathedral and coffered ceilings, four-piece crown molding, solid-core doors, custom built-ins, cherrywood flooring throughout, chic lighting fixtures, and oversized impact-rated windows and French doors that fill the residence with natural light and sweeping water views. Recent improvements include a new metal roof (2024), rebuilt dock, newer seawall and lift, resurfaced pool, fresh interior and exterior paint, new landscaping, updated exterior lighting, three new garage doors, whole-house lighting, and a new Kinetico water treatment system. A statuesque foyer entry opens to the formal living room, where a stone gas fireplace flanked by custom built-ins serves as the focal point. Walls of floor-to-ceiling French doors seamlessly connect the interior to the expansive outdoor entertaining areas overlooking Sarasota Bay. The formal dining room is complemented by nearby built-ins and a wet bar. At the center of the home, the gourmet chef’s kitchen features marble flooring, contemporary custom cabinetry, professional-grade Viking appliances including a six-burner gas range, double ovens, and Bosch dual dishwashers, along with an oversized island, breakfast bar, and informal dining area. An oversized walk-in pantry with additional wine refrigeration and a first-floor laundry room complete this thoughtfully designed culinary space. To the West, the family room offers en-suite bath access, and a walk-in closet—allowing flexibility as an additional guest suite if desired. A private study completes the main living level. The second floor is devoted to family and guest accommodations and can be accessed by either the elegant solid-wood staircase or private two-stop elevator. Upstairs, a media room and second laundry room enhance everyday convenience, while the bayfront primary suite serves as a luxurious retreat with walls of glass framing spectacular water views and access to an expansive terrace overlooking the bay. The en-suite bath is a spa-like sanctuary featuring extensive custom cabinetry, dual vanities, dedicated makeup area, soaking tub, large glass-and-tile shower, and private water closet. Three additional guest suites are positioned privately along the western wing of the home, each offering walk-in closets, en-suite baths, and one with direct terrace access. Outdoor living is equally exceptional. The multi-level bayfront entertaining areas include an expansive covered terrace with built-in grilling station, lounge and dining spaces, heated swimming pool, and direct boating access—creating an ideal environment for boating enthusiasts and waterfront entertaining alike.
Located within the coveted Bird Key community, residents enjoy a prime Sarasota address between downtown Sarasota and St. Armands Circle.
#A4692992

SARASOTA

667 MOURNING DOVE DRIVE

5 Beds

5 Baths

6,570 Sq.Ft.

$10,995,000

MLS#: A4692992

Coming soon
Behind the guarded gates of Dorado Beach East, on one of the largest lots in the community, this residence claims a rare footprint: 22,908 sq ft of land, 12,112 sq ft of total built area, and 7,932 sq ft of living space. Built in 2003 and held privately since, it sits on high ground outside the special flood hazard area, an increasingly scarce combination on Puerto Rico's north coast.

Inside, a sunlit foyer opens beneath a sculptural spiral staircase that anchors the home. The gourmet kitchen was built for someone who actually cooks, and it opens directly into the living and dining areas, which in turn flow out to the terrace so the entertaining space effectively doubles when the doors are open. Five bedrooms, each with its own en-suite bath, give every guest a private wing of their own. The primary suite goes further, adding a spa-inspired bathroom, a private mezzanine gym and a terrace of its own. With seven full baths and a powder room in total.

The outdoor space is the argument for the lot. A pool sits framed by mature tropical gardens, alongside a full outdoor kitchen and grill, with room left over for shade, seating and play. The house is equipped for real island living: a three-car attached garage , a cistern system, a whole-house generator and an integrated security system, so the property runs through storm season without improvising.

Dorado Beach East remains one of the island's most established guard-gated addresses. Residents have a private social club with pool, tennis courts, soccer field and park, and are minutes from world-renowned golf, the Dorado Beach Ritz-Carlton Reserve and the beaches that made Dorado what it is. HOA $1,095 monthly. CRIM: 12,656 annually. Garage: Yes | Attch: Yes | Spcs: 3
Showings by appointment.
#PR9123735

DORADO

331 DORADO BEACH EAST

5 Beds

7 Baths

7,932 Sq.Ft.

$10,995,000

MLS#: PR9123735

WELCOME TO THE ONLY BRAND NEW COMPLETED GULF FRONT HOME FOR SALE ON THE ENTIRE WEST CENTRAL COAST OF FLORIDA. GATED BEACHFRONT ESTATE WITH A RARELY FOUND PRIVATE DOCK ON THE INTRACOASTAL WATERWAY. Welcome home to the epitome of coastal luxury in this outstanding Indian Rocks Beach location boasting Modern Key West-inspired design by renowned Matta Architecture, a magnificent Gulf beach, and unobstructed panoramic views of the Gulf and Intracoastal. In addition to the dune-protected pristine beach, this unique family retreat features a new gated private dock with 20,000# boat lift on the beautiful Intracoastal Waterway. Built to the latest building codes with full exterior concrete block and steel reinforced foundation construction, impact windows/doors, and elevated FEMA-compliant living for flood risk reduction and optimal insurance premiums. Enjoy refined finishes and superior appointments throughout with over 9,551 Total Square Ft/ 5,825 SF Under Air which includes an oversized garage with parking for 6 cars and 3 stop Elevator. From the Mahogany front door to the custom contemporary cabinetry, the professionally designed interior takes full advantage of abundant natural light and outstanding water views from every room. An open floor plan offers an intimate entry, Great Room with LED cove ceiling lighting, 80-inch Modern Flames fireplace, expansive beachfront and intracoastal terraces and panoramic views. The refined kitchen is designed for seamless entertaining with top-of-the-line appliances, (Bertazzoni/Fisher & Paykel/Thermador) and custom finishes, a surround dining island and additional center island, luxurious Cachoeiro white marble countertops, 48-inch freestanding 6-burner gas range with griddle, dining area and an entertaining bar with prep sink, wine refrigeration, beverage center and ice maker. Living spaces include 5 ensuite bedrooms, a private office, flex room and laundry room on each living level.  The top level Primary Retreat delivers on the best of privacy, appointments and views. Elegant accommodations include full retracting glass doors to full width private terrace and spectacular sunsets, adjacent sitting room with Gulf views, morning bar w/ sink, beverage center and terrace access, gracious his/hers closets and a stunning spa-inspired bath featuring dramatic finishes, Bianca Dolomite counters, a soaking tub and impressive dual shower. Immerse yourself in outstanding Florida coastal living outdoor oasis with a choice of entertaining areas, multiple terraces, expanded covered lanai, PebbleSheen saltwater pool and spa, Omni-Logic pool controller, LED lighting and Ivory Shellock pool deck where you can experience the sights and sounds of this unmatched beachfront location. Reinforced construction includes superior energy efficiency, smart home features, Hardie Plank siding, High Efficiency LG HVAC, premium Low-E impact windows/sliders, CAT6 wiring (cameras, WiFi and sound), natural gas, tankless water heater, whole house 22KW generator, oversized 6 car garage pre-wired for 2 EV charging stations, lush landscape and more. Note: This home is built to superior V zone standards and located in a more favorable AE flood zone, providing better safety and lower insurance premiums. Indian Rocks Beach offers a quiet, laid-back atmosphere with miles of sandy beach, yet remains convenient to the larger cities of Tampa, St Petersburg and Clearwater.  Zoned to allow short term rentals if desired.
#T3503774

INDIAN ROCKS BEACH

34 GULF BOULEVARD

5 Beds

5 Baths

5,825 Sq.Ft.

$10,995,000

MLS#: T3503774

Experience the epitome of luxury in this custom-built waterfront estate by Bayfair, offering unobstructed views of Tampa Bay and beyond to downtown St. Pete and an exceptional blend of modern comfort and timeless elegance. This home is meticulously designed to capture the beauty of its surroundings while providing unparalleled luxury. Grand Entrance: As you step through the front door flanked by copper gas lanterns, you're welcomed by a dramatic two-story foyer featuring a stunning curved stairwell, setting the stage for the exquisite craftsmanship found throughout the home. Open-Concept Layout: The expansive, light-filled living space flows seamlessly, perfect for both grand entertaining and intimate gatherings. A formal dining room offers an elegant setting for hosting, while a nano-wall of windows provide breathtaking views of the water. It really makes you say WOW when you walk inside. Gourmet Kitchen & Casual Dining: The heart of the home, the kitchen, is equipped with Wolf and Sub-Zero appliances, custom stained light grey oak cabinetry, a spacious walk-in pantry, and a butler’s pantry with a wine fridge. The oversized island is perfect for meal prep and casual seating, while the adjacent casual dining area offers a bright, informal space to enjoy everyday meals with stunning views of the bay. Main Level Amenities: The first floor includes a guest bedroom with a full pool bath, a powder bath, and a mudroom/drop zone, offering convenience and practicality. Entertainment Zone: A dedicated entertainment area features a golf simulator, bar, and media room, creating the perfect space for hosting gatherings or enjoying family movie nights. Outdoor Living: The outdoor space is a true oasis, with a resort-style pool, spa, firepit seating area, and a wide covered porch ideal for dining and lounging. The outdoor kitchen, complete with a Alfresco built-in grill, makes outdoor entertaining effortless. Primary Retreat: The upstairs primary suite is a private sanctuary, featuring a sitting area with access to a private balcony offering panoramic views of Tampa Bay. It boasts a walk-in closet for two with a large island for additional storage, a spa-like bath with dual vanities, a steam shower, a jacuzzi tub, and his-and-hers water closets. Upstairs Features: Four additional en-suite bedrooms, each with spacious closets, provide ample space and privacy, a custom office with modern oak paneling and views of the bay offers a tranquil workspace. A large utility and laundry room makes those chores effortless. Garages & Storage: With split garages—a 1-car and a 2-car garage—there's room for car lifts and ample storage for vehicles or other belongings. Additional Features: A whole-house generator ensures you’re always comfortable, while high-end finishes, smart home Elan and Lutron technology systems, and energy-efficient features, such as high-impact windows and tankless water heater along with whole home water filtration system are just a few of the upgrades that make this home special. In summary, this home has it all with a floorplan that meets all the needs of a modern lifestyle as well as the construction quality and durability to make living on the open bay effortless.
#TB8509085

TAMPA

5120 W LONGFELLOW AVENUE

6 Beds

6 Baths

6,959 Sq.Ft.

$10,995,000

MLS#: TB8509085

A True Island Estate…This picture perfect home is located in The Exclusive Cocoanut Bayou neighborhood.  An intimate community with estate sized parcels, deep water docks, canopy lined streets and even a gated private beach.  This home was redesigned by Clifford Schultz and could be featured in House Beautiful. The gated parcel is almost 2/3 of an acre, complete with mature tropical landscaping. The home features an oversized Chicago brick motor court with a 3 car side entry garage. The custom wood detailing throughout includes mahogany entry doors, crown moldings, cased impact windows, shiplap ceilings, wainscoting, custom built-ins and more. A gourmet kitchen with Campbell Custom Cabinetry featuring a butler’s pantry, a beverage station, Wolf appliances and an entertaining island complete with additional seating.  The main house has a foyer gallery wall, soaring ceilings, picture perfect views, a Holiday sized living room, a coveted great room, a morning room, a private office, as well as a spectacular Owner’s suite…. all located on the first living level. The owner’s suite has a large sitting area, a spa inspired bathroom and 2 walk-in closets.  The second floor has a hobby room, 3 ensuites and a flex room.  The guest house above the garage has a kitchenette, a great room and an ensuite with private entrance in close proximity to the main home. The outdoor veranda is complete with kitchen, dining and living areas.  The mesmerizing views of the Bayou are ever changing, a kaleidoscope of nature … you will see dolphin, manatee, area fish and seabirds, mangroves and much more.  A resort style pool with travertine pavers, a separate spa, a large garden, and 2 boat docks complete this waterfront lifestyle.  Cocoanut Bayou is minutes to Siesta village for shopping, dining and Siesta’s world-famous beach.  You are close to downtown Sarasota which is known for its cultural significance.  The opera, orchestra, ballet, symphony, performing arts center, art galleries are all at your disposal. Shop, dine or just enjoy the city that embraces it all. Sarasota County really has something for everyone. Selby Botanical Gardens, Mote Marine Aquarium, several nature parks, bike trails, water sports, Polo, sport venues, multiple Universities and the list goes on.  Don’t wait to discover this unique opportunity … It will not last long.
#A4621775

SARASOTA

241 CEDAR PARK CIRCLE

5 Beds

5 Baths

6,838 Sq.Ft.

$10,995,000

MLS#: A4621775

1 ... 62 63 64 65 66 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by The Graf Group of Coldwell Banker via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by The Graf Group of Coldwell Banker via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.